Public procurement in the Republic of the Congo: the 2009 code, the ARMP and e-procurement
Public purchasing in the Republic of the Congo is governed by a procurement code adopted by Decree No. 2009-156 of 20 May 2009, substantially amended in 2023, and overseen by the Public Procurement Regulatory Authority (ARMP), placed under the Prime Minister by Decree No. 2024-2073 of 10 October 2024. The current reform is e-procurement: a decree of the same date sets up an electronic tendering platform run by the ARMP.
For a European equipment supplier, the practical questions are where tenders are published and how a foreign bid is weighed against local ones. The answers below draw on the texts published by the ARMP and on the WTO report of August 2023.
Updated on 20 October 2026
The texts that matter
The foundation is still Decree No. 2009-156 on the procurement code, amended by Decree No. 2023-1732 of 12 October 2023. Thresholds are set by Decree No. 2009-162, amended in 2011 and again by Decree No. 2023-1734 of 12 October 2023. Below the thresholds a purchase falls outside the code's procedures but must still be competed among at least 3 bidders, subject to prior review by the Directorate-General for Public Procurement Control.
Criminal penalties are set out in Law No. 31-2012 of 11 October 2012, which punishes influence peddling, over-invoicing and fraud with 2 to 5 years' imprisonment. At regional level, CEMAC Regulation No. 06/09-UEAC-201-CM-20 sets the principles of open access and transparency for procurement by Community institutions.
Thresholds, international tenders and local preference
The WTO report gives tendering thresholds of CFAF 50 million for works and supplies and CFAF 10 million for consultancy services. International competitive bidding applies from CFAF 2 billion for works and CFAF 500 million for supplies. These figures stem from the 2009 and 2011 decrees, so the October 2023 amendments mean the thresholds in force should be checked for each tender.
Foreign suppliers need to factor in local preference. Bids from firms based in Congo or CEMAC receive a 10-point advantage at evaluation; where the tender documents provide for it, a margin of 7.5% to 10% applies on works and up to 15% on other contracts. Law No. 3-2000 also reserves 50% of subcontracting for nationals. Congo is not a party to the WTO Government Procurement Agreement.
Finding notices: the ARMP portal and real practice
The ARMP website offers a tender portal, an official procurement bulletin and a company register. Decree No. 2024-2072 of 10 October 2024 provides for a fully electronic cycle, from planning to archiving, with electronic signatures, encrypted bids and time-stamping, rolled out in phases alongside paper procedures for a transitional period. Decree No. 2025-90 of 1 April 2025 gives the ARMP responsibility for running that platform.
The US International Trade Administration's guide of June 2024 paints a less tidy picture: some opportunities circulate before publication or are posted only on paper at the ministry concerned. It quotes publication thresholds of USD 100,000 for equipment and USD 40,000 for services. On projects financed by a multilateral bank, the lender's own procurement rules often apply too.
Bidding from abroad
A foreign bid starts with a close reading of the tender file: qualification criteria, any preference margin, required securities, language and currency of the bid. The bidder's administrative documents, often requiring legalisation, usually take longer than the technical offer.
Sobetracom works upstream of the buyer's or bidder's submission: finding manufacturers that meet the specification, comparing offers and obtaining written data sheets and delivery commitments, while leaving submission and dealings with the contracting authority to the bidding entity.
Frequently asked questions
- Can a Belgian supplier bid directly for a Congolese tender?
- The code does not bar it, but each tender file must be read carefully: local preference, the 10-point advantage for firms based in Congo or CEMAC and the share of subcontracting reserved for nationals can all affect the ranking.
- Is electronic bidding already compulsory in the Republic of the Congo?
- Decree No. 2024-2072 provides for a phased roll-out, with paper procedures continuing for a time. Check the submission method stated in each notice, and have the contracting authority confirm thresholds and procedures before you prepare your bid.
Sources
- Autorité de régulation des marchés publics (ARMP), Cadre juridique (October 2026)
- OMC, Examen des politiques commerciales CEMAC, annexe Congo, paragraphes 3.108 à 3.112 (August 2023)
- International Trade Administration, Republic of the Congo Country Commercial Guide, Selling to the Public Sector (June 2024)
This page summarises public sources as of the date shown. It does not replace the official text: check it before committing to a purchase, a bid or a shipment.