Sobetracom

Practical guides

Practical guides: preparing an equipment shipment to Africa

Most of what decides an equipment shipment to Africa happens before loading. The choice of Incoterm, among the ICC's 11 rules, sets who arranges carriage, who insures it and who clears customs. The proforma invoice often opens the import file, the bill of lading governs collection at the port, and a letter of credit only pays against compliant documents. As hub.brussels points out, the documents required depend on the nature of the goods, the mode of transport and above all the destination, so these guides start from the requirements of the countries of arrival, with sourced examples from DR Congo, Nigeria, Côte d'Ivoire, Cameroon, Guinea and Benin.

Each guide draws on official or institutional sources (ICC, European Commission, customs authorities, inspection bodies, central banks) and gives the date of the texts it cites. Sobetracom, a purchasing office based in Marcinelle, Belgium, prepares these documents on the supplier side and coordinates forwarders and customs brokers; in DR Congo, Burundi, Guinea and Nigeria, its relays also follow the goods on arrival. Rules change, so every formality should be confirmed with the country's licensed broker before shipment.

  • EXW Incoterm

    EXW leaves loading, the Belgian export declaration and all carriage to the African buyer. What that means, and when FCA is the better choice.

  • FCA Incoterm

    FCA gives export clearance to the supplier and freight to the buyer. Delivery point, on-board bill of lading and Nigeria's local insurance explained.

  • CIF Incoterm

    Under CIF, risk passes at the port of loading and minimum cover is enough. Why CIF clashes with local insurance rules in DR Congo and Cameroon.

  • DAP Incoterm

    Under DAP, the supplier carries the risk to the agreed place in Africa; the buyer clears and unloads. How to name the place and break down freight.

  • DDP Incoterm

    Under DDP the foreign supplier clears customs and pays taxes on arrival. Why that is often impossible in Nigeria or DR Congo, and what to do.

  • Proforma invoice

    Form M in Nigeria, the DIB in DR Congo, the Ivorian conformity certificate: the proforma starts the import file. What to include and what to avoid.

  • Certificate of origin

    Non-preferential certificates of origin from Belgian chambers of commerce: content, legalisation, and when Guinea, Benin or DR Congo ask for one.

  • EUR.1 and EPAs

    An EUR.1 only helps where an EPA applies to EU exports: Cameroon, Côte d'Ivoire, Ghana, Kenya. Not in DR Congo, Nigeria or Guinea.

  • Bill of lading

    Order or straight bills, originals needed at the port, shipment date and Benin's cargo tracking note: what to settle before loading.

  • Letter of credit

    Confirmation by a Belgian bank, the 21-day rule and Form M in Nigeria: how a letter of credit secures a purchase bound for Africa.

  • Cargo insurance

    Clauses A or C, 110% sum insured, compulsory local import cover in DR Congo, Burundi and Nigeria: who should insure an equipment shipment to Africa.

  • Packing list

    What an export packing list should contain, why it must match the invoice, and how inspection agencies and African customs use it.

  • Pre-shipment inspection

    PVoC in Kenya, SONCAP in Nigeria, verification for DR Congo: how pre-shipment inspection works and what the supplier needs to prepare.

  • Choosing a container

    Dimensions, payload, high cube, open top, flatrack and VGM weighing: how to choose the right container for an equipment shipment to Africa.

  • Air or sea freight

    Volumetric weight, lithium batteries, switching transport mode for DR Congo, landlocked routes: how to choose between air and sea for Africa.

  • LCL or FCL

    W/M rates, a break-even around 13 to 15 m³, handling, bills of lading and seals: when to consolidate a shipment to Africa and when to book a box.

  • Dangerous goods

    IMDG Code by sea, IATA DGR by air, ADR to the port, safety data sheets required in Nigeria and DR Congo: the rules a supplier needs to know.

  • Export declaration from Belgium

    EORI, AES declarations, office of export and office of exit, customs representatives: how equipment leaving Belgium for Africa is declared.

  • Dual-use goods

    Regulation (EU) 2021/821, regional licences in Belgium, end-use controls and embargoes: what an exporter must check before equipment ships.

  • Tropicalising equipment

    IP ratings, IEC 60068-2-30 damp heat testing, condensation in containers: how to specify equipment that must work in hot, humid climates.

A project in Africa? Let's talk.

Tell us what you need and where it goes. We come back to you with first leads.