UNOPS: origin of goods and supplier nationality
Unlike several development banks, UNOPS has no general list of eligible countries of origin. Its Procurement Manual starts from the opposite principle: every supplier is eligible unless a specific ground for exclusion applies. Origin still matters, in several ways: what the agreement with the partner funding the project provides, the sanctions lists, and the export and import rules of the countries involved.
For a European manufacturer or distributor, the key is to read each tender's documents, which must name any excluded nationalities, and to prepare the proof of origin that shipping and customs clearance will require.
Updated on 21 October 2026
Project agreements may exclude nationalities
Section 3.3 of the Manual lists the only grounds for ineligibility. The first covers a vendor whose nationality is excluded under the project agreement between UNOPS and its client. The Manual defines nationality: a vendor has that of a country if it is a citizen, or is constituted, registered and operates under that country's laws. What is tested here is the bidding company, not the place where the product is made.
Section 6.5.3.1 requires UNOPS to state any excluded nationalities clearly in the solicitation document. Where none are listed, no restriction of that kind applies. The same section treats goods being ‘of eligible origin’ as a formal criterion, so a bid can fail on this point at preliminary screening.
Consortia and sub-contractors
Revision 2024/07 of 20 September 2024 settled a point that is easily overlooked. Every member of a joint venture or consortium, and every sub-contractor, must meet the same eligibility conditions as the bidder, nationality included. A distributor relying on a third-party manufacturer or installer should check their status before naming them in the bid.
Sanctions and ineligibility lists
The Manual also excludes any vendor on the United Nations Ineligibility List, on the Consolidated United Nations Security Council Sanctions List, which includes the 1267/1989 list, or on the World Bank's debarment lists. A project agreement may add the client's own ineligibility list. These checks cover the company, its consortium partners and its sub-contractors.
In practice, a supplier whose partner manufacturer appears on one of these lists puts its whole bid at risk. The check belongs before submission, not after award.
Export and import: permits and certificates of origin
Section 12.6 points out that national rules weigh as much as UNOPS rules. An exporting country may require a licence for dual-use goods such as high-end computers or telecommunications equipment. The importing country may require prior authorisation for telecoms equipment or pharmaceuticals, ban some used vehicles, or even goods of certain origins. The receiving office must confirm that the permit is in hand before the supplier is cleared to ship.
Under section 12.3.4, every shipment documents the origin of the goods where required. The certificate of origin, issued by a chamber of commerce, is usually needed for import. For equipment made outside Europe and resold from Belgium, it is worth settling early who will obtain it.
Domestic preference only when announced
Section 6.5.3.3 allows, where the project agreement provides for it, a margin of preference for domestic firms or for goods made in the country, in open international tenders. The solicitation document must then state the percentage added to foreign offers.
From Belgium, Sobetracom checks these points for each tender: excluded nationalities, the status of manufacturers and sub-contractors, export licences, import permits and the certificate of origin. Project agreements differ from one partner to the next, so the tender documents remain the only reference.
Frequently asked questions
- Does UNOPS require goods of European or American origin?
- Not as a general rule. The Manual treats every vendor as eligible unless a specific exclusion applies, such as a nationality excluded by the project agreement, which must then appear in the documents.
- Does my sub-contractor also have to be eligible?
- Yes. Since Revision 2024/07, every sub-contractor and every consortium member must meet the eligibility conditions in section 3.3.
- Who obtains the import permit for telecoms equipment?
- The Manual requires the receiving office to confirm the permit is in hand before the supplier is authorised to ship. Without it, port storage costs fall on the receiver.
Sources
- UNOPS, Procurement Manual, Revision 7, section 3.3 (October 2026)
- UNOPS, Authoritative Revision Ref. 2024/07 to the Procurement Manual Rev. 7 (October 2026)
This page summarises public sources as of the date shown. It does not replace the official text: check it before committing to a purchase, a bid or a shipment.