European Union: putting together a PRAG-compliant supply tender

Supply contracts under EU external action are built on a standard tender dossier whose templates sit among the c4 annexes of the PRAG. Buyers adapt them, but the structure is the same from one country to the next, so a supplier can know in advance what it will have to produce.

This guide walks through what the dossier contains, what the tenderer submits and how the tender is examined, based on PRAG 2025.

Updated on 20 October 2026

Parts A to D of the tender dossier

Under section 4.3.2, the dossier is published together with the contract notice and shared through the Funding & Tenders Portal. It contains: A, instructions to tenderers; B, the draft contract, with its main, special and general conditions and annexes, including the technical specifications; C, further information; and D, the tender form.

On the tenderer's side, the documents to complete mirror the contract annexes: the technical offer (Annex III), which answers the Annex II specifications column by column, the financial offer (Annex IV) and, where required, the tender guarantee. Annex V gathers the guarantee templates and the tax and customs arrangements for the project. An administrative compliance grid and an evaluation grid come with the dossier, and reading them first shows exactly what will be checked.

Selection: declare first, prove later

Selection criteria such as financial capacity, experience and technical resources are drafted for a YES/NO assessment based on the standard tender form. Tenderers state their capacity there and sign a declaration on honour about exclusion situations; the contracting authority must accept the European Single Procurement Document (ESPD) instead.

Only the presumed successful tenderer then supplies supporting evidence, which is optional below EUR 300 000. The declaration is not requested again if it was submitted for another procedure less than 1 year earlier and nothing has changed. Before award, the buyer checks that the company and its subcontractors appear neither in the EDES exclusion database nor on EU restrictive measures lists.

A technical offer judged line by line

Technical specifications may set minimum quality levels, environmental performance, conformity assessment procedures, safety, packaging and labelling requirements, and delivery, installation, training and after-sales service. A brand may only be named if followed by "or equivalent".

The technical evaluation follows a YES/NO grid published with the dossier, which cannot be changed afterwards. A single non-compliant feature is enough to reject a tender, whatever its price. It therefore pays to attach the manufacturer's datasheets and show, line by line, where the evidence for each requirement can be found.

Submission and how long the offer binds you

Under direct management, tenders go exclusively through eSubmission on the Funding & Tenders Portal; anything sent by email or post is disregarded. Under indirect management, the technical and financial offers go in one sealed envelope, itself placed inside a second envelope.

A supply tender binds its author for 90 days from the deadline. The buyer may ask for a single extension of up to 40 days, which the tenderer may refuse without losing its guarantee. The successful tenderer stays bound for a further 60 days, so up to 190 days in total, a period to reflect in the validity of manufacturers' quotations.

Preparing the file with the manufacturer

Sobetracom has no assignment history with the EU institutions. From Belgium, it helps a supplier or buyer collect datasheets, build the compliance table against the specifications and align the validity of manufacturers' prices with that of the tender. Templates change between PRAG editions, so the dossier published for the procedure is the only reference.

Frequently asked questions

Do turnover statements and references have to be attached at submission?
Generally not. PRAG 2025 provides that only the presumed successful tenderer supplies evidence for the selection criteria before award. At submission, the statements in the tender form and the declaration on honour are enough unless the dossier says otherwise.
Can I offer equipment of a different brand from the one named?
Yes. Where a brand is named it must be followed by "or equivalent", and it is up to the tenderer to show that its equipment at least matches the stated characteristics.
How long does a tender remain valid?
90 days after the deadline in a supply procedure, with one possible extension of up to 40 days and a further 60 days for the successful tenderer.

Sources

  1. Commission européenne, DG INTPA, PRAG 2025, section 4.3.2 (October 2026)