Import guide · Cameroon

Shipping equipment to Cameroon: Douala, Kribi and inland corridors

Cameroon has two container ports with very different profiles: Douala, the long-established estuary port and gateway to Chad and the Central African Republic, and Kribi, a deep-water port whose second phase opened in 2025. Choosing between them, and then the inland route to the final site, affects a project’s lead time and cost as much as the purchase price of the equipment.

The figures below come from the two port authorities, the National Shippers’ Council and the US commercial guide, checked at the latest update of this page.

Updated on 20 October 2026

Douala: an estuary port with a rail link

Douala-Bonabéri sits at the end of a 50 km access channel, of which the inner 25 km is dredged continuously to hold a depth of -7 m. That depth limits vessel size, which is why feeder services are common. In return the port offers 10 km of quay, 20 berths and 20 km of track connected to the Transcamerounais railway, which runs from Douala to Ngaoundéré in the Adamawa region.

In 2024 the Douala Port Authority reported total traffic of 13,000,000 and 166,519 full TEU imported. Transit traffic reached 1,713,953, reflecting Douala’s role for neighbouring landlocked countries.

Kribi: deep water in the south

The Kribi Port Authority opened Phase II on 9 May 2025: a container terminal with 715 metres of quay and 16 metres of depth, able to receive large container ships calling directly. In 2025 the port handled 559 vessel calls, around 16 million tonnes of cargo and 110593 full TEU of imports, alongside 348289 TEU of transhipment.

For deliveries to Yaoundé or the south, Kribi can shorten the sea leg. For the Littoral, West or North regions, Douala keeps the advantage of rail and proximity. The choice depends on the services available from Antwerp and on the final delivery address.

Onward to Chad and the Central African Republic

Douala handles most transit traffic for Chad and the Central African Republic. According to the International Trade Administration, goods in transit to these countries, and to the Republic of Congo, are held in bonded warehouses against a guarantee equal to the import taxes, released once re-export is confirmed. GPS tracking, run jointly by Customs and SGS, follows the trucks to the border. For a project in Chad, the transit file should therefore be prepared from the bill of lading onwards, with the final consignee clearly named.

Air freight and land borders

For urgent or sensitive items, Douala and Yaoundé Nsimalen airports handle air cargo, and since 04 June 2018 the CNCC has required a BESC there for each air waybill. In the south, the Kye-Ossi crossing on the borders with Gabon and Equatorial Guinea has issued land BESCs since 1 March 2018. The CNCC also operates at small ports such as Tiko, Idenau and Bota.

From Belgium, Sobetracom compares freight offers from Europe, arranges container stuffing at the manufacturer’s site and sends the buyer’s chosen forwarder documents consistent with the selected port of discharge. Port conditions and transit rules change, so confirm the routing with your forwarder and licensed broker before booking.

Frequently asked questions

Is Kribi a better choice than Douala for a site in Yaoundé?
Kribi offers 16 metres of depth at the quay, Douala offers rail and a denser network of services. The answer depends on the shipping lines available and road access to the site, so compare door-to-door quotes.
Can a heavy load reach Ngaoundéré by train?
Douala port is linked by 20 km of track to the Transcamerounais line, which runs to Ngaoundéré. Feasibility depends on the load gauge and available wagons, to be confirmed with the rail operator.
How does the transit guarantee for Chad work?
According to the International Trade Administration, Customs holds a guarantee equal to the import taxes and releases it once re-export is confirmed.

Sources

  1. Port autonome de Douala, « P'tite histoire » (October 2026)
  2. Port autonome de Douala, chiffres clés (October 2026)
  3. Port autonome de Kribi, « Phase II : le Port autonome de Kribi change de palier » (October 2026)
  4. Port autonome de Kribi, page d'accueil (October 2026)
  5. U.S. International Trade Administration, Cameroon Customs Regulations (October 2026)
  6. Conseil national des chargeurs du Cameroun (CNCC) (October 2026)

This page summarises public sources as of the date shown. It does not replace the official text: check it before committing to a purchase, a bid or a shipment.