Sobetracom

Import guide · Guinea

Shipping equipment to Guinea: Conakry port, the airport and onward roads

Nearly all equipment bound for Guinea comes in through Conakry. The Port Autonome de Conakry states that 90% of the country's foreign trade passes through it, and the only international airport is also in the capital. Logistics for a Guinean project therefore has two stages: entry through Conakry, then the often harder leg inland.

Whether to ship by container, break-bulk or air depends on the type of equipment, its size and its urgency. Below are the reference points published by the port and the WTO.

Updated on 20 October 2026

Conakry's container terminal

According to the port authority, the container terminal, run under a public-private partnership with the Bolloré Group, covers 200,000 m2 with 600 m of quay able to berth 2 ships at once. Berth PQ12 is 340 m long with 13 m draught. The 25-year concession also includes an 11,000 m² storage area at the railway station and 5,000 m² at the Kagbélén dry port on the edge of the city.

For most office, laboratory or telecom equipment, containers remain the easiest option to document and secure.

Heavy and out-of-gauge cargo: break-bulk

The break-bulk side of the port, for non-containerised goods, is concessioned to Alport Conakry for 25 years. Quays PQ02 to PQ05 total 493 m. The access channel is 5,000 m long and 150 m wide with an average depth of 10 m, which limits vessel size.

For a transformer, a machine tool or a large generator, lifting capacity at the planned berth should be checked with the carrier and the stevedore before packing and shipping mode are fixed. The port reports total traffic of 11,736,913 tonnes, dominated by bauxite, so berth slots can be in demand.

Air freight: a single international gateway

The WTO notes that Guinea has one international airport, in Conakry, and 14 inland aerodromes, 4 of them serving mines. The airport is run by SOGEAC, the sole ground handling provider. Air freight suits urgent spares, reagents and sensitive medical equipment, with the same customs clearance as at the port.

Beyond Conakry: the road leg

The WTO described a road network of 35,000 km, about 15% of it paved, and observed that Guinea had not put in place the ECOWAS inter-state road transit system. Even so, the port reports transit traffic of 650,047 tonnes, up 119.9%. For deliveries to Upper Guinea or the forest region, road conditions and journey time often matter more than the sea crossing. The deep-water mineral port at Kamsar handles mainly bauxite and is not a usual alternative for project equipment.

Frequently asked questions

Does a container for Conakry have to go through the Kagbélén dry port?
Not necessarily. Kagbélén is a storage area attached to the container terminal concession; where the container is unstuffed and cleared is decided with the buyer's forwarder and customs broker.
Can equipment for a mine site come in through Kamsar rather than Conakry?
According to the WTO, Kamsar is a deep-water mineral port used mainly for bauxite exports. For project equipment, Conakry remains the standard point of entry; arriving through a mining port would require a specific arrangement with the operator concerned and has to be studied case by case, including how customs formalities would be handled there.
How does Sobetracom organise transport to Guinea?
Sobetracom selects the right mode with the forwarder (container, break-bulk or air), prepares packing and marks, and our relays in Guinea follow the equipment from Conakry to the delivery site. Port conditions change, so routing and formalities are confirmed with the licensed customs broker before booking.

Sources

  1. Port Autonome de Conakry, page d'accueil (October 2026)
  2. Port Autonome de Conakry, Nos installations portuaires (October 2026)
  3. Port Autonome de Conakry, Nos concessions portuaires (October 2026)
  4. OMC, Examen des politiques commerciales de la Guinée, rapport du Secrétariat WT/TPR/S/370, avril 2018 (October 2026)

This page summarises public sources as of the date shown. It does not replace the official text: check it before committing to a purchase, a bid or a shipment.

A project in Africa? Let's talk.

Tell us what you need and where it goes. We come back to you with first leads.