Import guide · Côte d'Ivoire
Getting equipment to Côte d'Ivoire: Abidjan, San Pedro, air and rail
Côte d'Ivoire has autonomous ports at Abidjan and San Pedro, an international airport at Abidjan and a railway running north. For equipment bought in Europe, Abidjan is the default gateway. It is not always the sensible one when the project site lies far from the economic capital.
The entry point should be chosen when forwarders are being consulted, not once the goods are ready. It drives the Incoterm, the lead time and the cost of the last leg to site.
Updated on 20 October 2026
Abidjan: busy and getting busier
According to figures announced on 12 February 2026 and reported by the AIP press agency, the port of Abidjan handled 46.6 million tonnes in 2025, up from 40.1 million in 2024, an increase of 16.1%. Container traffic reached 1,697,131 TEU. Transit to landlocked countries came to 3.91 million tonnes, up 34.1%, including 2,400,111 tonnes for Burkina Faso and 1.47 million tonnes for Mali.
Growth has a cost. In May 2025 the regional director of Africa Global Logistics, which runs Abidjan's main port, acknowledged that the city suffers from centralisation, with everything converging on the port. The operator plans to spend more than €60 million over 5 years on inland hubs at Ferkessédougou, Bouaké and San Pedro.
San Pedro for the south-west
The port of San Pedro is the country's second port by cargo volume and the world's leading cocoa export port, according to the US International Trade Administration. It is the subject of a $2 billion expansion programme that includes a mineral terminal linked to the Man–San Pedro railway and a logistics zone at Odienné.
For a mining, agricultural or water project in the west or south-west, San Pedro can shorten the road leg considerably. Volumes are less steady, though: the Ministry of Transport recorded an 8.0% fall in total traffic there in the first half of 2024. Check that the chosen shipping line actually calls there; the Vessels module of the BSC platform lists ships due at both ports.
Air freight and rail as complements
Félix Houphouët-Boigny International Airport in Abidjan handled 16,095 tonnes of commercial freight in the first half of 2024, up 10.4%. It is the obvious route for urgent spares, sensitive medical equipment or compact measuring instruments.
The railway operated by SITARAIL carried 412,808 tonnes of freight over the same period, up 2.7%, while passenger services have been suspended since 2020. For heavy loads heading to the centre and north it can complement road haulage, provided transhipment is planned for.
Arranging the shipment from Europe
Sobetracom asks forwarders to quote for both ports and for air freight, compares the offers on a like-for-like basis and coordinates collection from the manufacturer, from Belgium, with the forwarder and customs agent appointed by the buyer. Port calls, capacity and transit times change quickly, so the forwarder and the buyer's licensed customs agent should confirm the routing before booking.
Frequently asked questions
- Must a project in western Côte d'Ivoire be supplied through Abidjan?
- Not necessarily. San Pedro, the country's second port, can shorten the road journey to the west and south-west, provided a suitable shipping line calls there.
- Does transit to Burkina Faso or Mali go through Côte d'Ivoire?
- Partly. According to the AIP, the port of Abidjan handled 3.91 million tonnes of transit for landlocked countries in 2025, including 2,400,111 tonnes for Burkina Faso. Transit formalities then follow a different regime from imports into Côte d'Ivoire.
- Can the railway still carry passengers as well as freight?
- Freight runs, but passenger services have been suspended since 2020, according to the Ministry of Transport.
Sources
- Agence ivoirienne de presse (AIP), 13 février 2026 (October 2026)
- Baird Maritime (dépêche Reuters), 15 May 2025 (October 2026)
- U.S. International Trade Administration, Market Intelligence, 01/15/2026 (October 2026)
- Ministère des Transports de Côte d'Ivoire, « Les transports en chiffres, 1er semestre 2024 » (October 2026)
- Office ivoirien des chargeurs, plateforme BSC opérée sur bsci.sgs.com (October 2026)
This page summarises public sources as of the date shown. It does not replace the official text: check it before committing to a purchase, a bid or a shipment.
