Import guide · Chad
Shipping equipment to Chad: the Douala–N’Djamena corridor, road and air freight
Chad has no coastline, so any equipment shipped from Europe by sea ends its journey by road. The nearest port, Douala, is 1 700 km from N’Djamena according to the WTO, and the Port Authority of Douala describes itself as the transit port for most traffic to Chad and the Central African Republic. LeFisk estimates that around 80% of Chadian goods pass through Douala alone, based on April 2025 data.
That dependence makes the Cameroonian corridor decisive for lead time and landed cost. This guide sets out the options and friction points as public sources describe them as of October 2026, for a buyer delivering to N’Djamena, Moundou or Abéché.
Updated on 21 October 2026
Douala first, Kribi alongside
The standard route is still discharge at Douala-Bonabéri, whose rail sidings connect to the Transcameroon railway as far as Ngaoundéré. From there, cargo continues by truck to the border and N’Djamena. The port of Kribi also handles a notable share of this traffic: around 68% of the transit passing through it is bound for Chad, according to LeFisk.
The choice between Douala and Kribi depends mainly on the shipping line, truck availability and final delivery point. It is settled with the forwarder when the quotation is prepared, not after the vessel arrives.
Road: distances, seasons and documents
Within Chad, the WTO described a network of about 40 000 km, of which 1 602 km were paved in 2011, with part of it impassable in the rainy season. The country has no railway. Timing therefore matters as much as routing, and a site in the south or east has to be scheduled around road access.
Transport between Cameroon and Chad follows a bilateral agreement of 13 April 1999, which reserved freight for hauliers registered in either country, split 65% for Chadian and 35% for Cameroonian companies. Trucks in transit carry the mandatory consignment note (LVO) and an international safe-conduct. Within Chad, the LVO is required for loads over one tonne carried more than 50km, for a fee of 7.5% of the transport invoice.
Corridor disruption in 2026
2026 showed how fragile this route can be. As of 3 April, 2 327 containers bound for Chad were held up in Cameroonian ports. On 15 June, Cameroon’s National Shippers’ Council suspended the BESC requirement on the Douala–N’Djamena and Douala–Bangui corridors to ease transit. On 25 and 26 June, a road blockade at Zébé, near Yagoua, over a dispute about haulage rates disrupted traffic again. LeFisk advises shippers to expect considerable procedural volatility.
For a project with a fixed deadline, it is sensible to allow extra time for the overland leg and to keep watching the situation until departure.
Air freight to N’Djamena
For urgent, compact or high-value equipment, air freight is the alternative. N’Djamena international airport is the country’s main airport; ASECNA also manages Abéché, Faya Largeau and Moundou airports under concession, and ground handling is provided by the state-owned RAHAT. Cost per kilo limits this option to light parcels or critical parts.
Sobetracom compares these scenarios with manufacturers at the consultation stage: actual weights and dimensions, packing suited to a long road journey and the option of delivering in several lots. The buyer’s forwarder then organises transport. As corridor conditions change quickly, ask your forwarder and licensed broker to confirm routing and documents just before dispatch.
Frequently asked questions
- How far is N’Djamena from Douala?
- The WTO states that the port of Douala is 1 700 km from N’Djamena. The actual road distance depends on the route chosen by the haulier.
- Can cargo go through Kribi instead of Douala?
- Yes, a significant share of Chadian transit already goes through Kribi according to LeFisk. The choice depends on shipping lines and available hauliers, and your forwarder can compare the options.
Sources
- OMC, Examen des politiques commerciales CEMAC, WT/TPR/S/285, annexe 5 Tchad (October 2026)
- LeFisk, « Cameroun-Tchad : douanes, corridor Douala-N'Djamena » (14 juillet 2026) (October 2026)
- Port autonome de Douala, « P'tite histoire » (October 2026)
This page summarises public sources as of the date shown. It does not replace the official text: check it before committing to a purchase, a bid or a shipment.
