Import guide · Senegal
Getting equipment to Senegal: the port of Dakar, Ndayane and the corridors
For equipment shipped from Europe, Senegal has a geographic edge: the country sits at the westernmost point of Africa, on the Atlantic seaboard, at the end of the main shipping routes from Europe. The Port Autonome de Dakar handles most of the country's imports and also acts as Mali's gateway to the sea.
That dual role has a downside: when the corridor to Bamako seizes up, the port gets congested. In the medium term, the Ndayane deep-water port is set to change the picture. This guide reviews the shipping routes using sources published in 2025 and 2026.
Updated on 20 October 2026
Port of Dakar, the main gateway
According to Ecofin Agency, which reported the port's figures on 21 April 2026, Dakar handled 29.66 million tonnes in 2025, up from 24.58 million tonnes in 2024. Container traffic grew more modestly, to 908,529 TEU from 881,289 TEU a year earlier.
For a buyer, what matters is the type of cargo. Full containers go through the container terminal, while out-of-gauge items such as a press brake, a transformer or construction plant need suitable bookings (ro-ro or breakbulk) and specific handling on arrival. That choice is made when carriers are consulted, not at loading.
The Dakar-Bamako corridor and its disruptions
Dakar handles about 70% of Mali's imports, according to its Director General as quoted by the daily Le Soleil. On 24 November 2025 he said that roughly 2500 containers bound for Mali were stuck at the port because of disruption on the road corridor, and that the port had asked shipping lines to waive storage, demurrage and detention charges.
For equipment destined for Senegal itself, the episode is a reminder that crowded yards can lengthen the time needed to get cargo out of the port. The Senegalese Shippers' Council, whose remit was extended to corridors in 2024, follows these issues on behalf of shippers.
Ndayane, the deep-water port in the pipeline
DP World is building a new deep-water port at Ndayane, about 50 km from Dakar. Baird Maritime reports a 5 km access channel dredged to 20 m, a 600 m turning basin and an 875 m berth able to take 2 ultra-large container ships at once. Dredging finished 13 months ahead of the September 2027 target, on a project worth USD 1.2 billion due to open in 2028.
Until then, Dakar remains the reference sea gateway. Projects with deliveries running beyond 2028 will need to check, shipment by shipment, which port the lines are calling at.
Air freight for urgent and sensitive items
For urgent spare parts, laboratory equipment or sensitive medical devices, air freight into Blaise Diagne International Airport, south of Dakar, remains the fastest option. It also escapes the 0.4% levy for the Senegalese Shippers' Council, which customs applies to sea imports only.
From Belgium, Sobetracom compares sea and air freight offers for each lot, taking account of weight, volume, urgency and handling constraints, then hands the buyer's chosen forwarder a complete shipping file.
Frequently asked questions
- Should we wait for Ndayane to open before shipping heavy equipment?
- No. Dakar already handles containers, ro-ro and heavy lifts. Ndayane, due to open in 2028, will mainly offer 20 m of depth for the largest container ships. The choice will depend on the port calls offered by shipping lines at that time.
- Can problems on the Mali corridor delay a delivery to Dakar?
- Indirectly, yes: in November 2025, a build-up of around 2500 Malian containers raised fears of port congestion. Build some slack into the schedule and have your forwarder and licensed customs broker confirm the situation just before loading.
Sources
- Agence Ecofin, « Dakar port traffic jumps in 2025 as imports and exports rise » (April 2026)
- Le Soleil (quotidien national sénégalais), « Perturbations du corridor Dakar-Bamako » (November 2025)
- Baird Maritime, « Dredging for Senegal deepwater port completed ahead of schedule » (July 2026)
- Commission économique des Nations unies pour l'Afrique (CEA), note d'information aux participants de la 54e session, Dakar (April 2022)
- Direction générale des douanes du Sénégal, FAQ sur les frais de dédouanement (July 2026)
- Conseil sénégalais des chargeurs (COSEC), « Le COSEC » (October 2026)
This page summarises public sources as of the date shown. It does not replace the official text: check it before committing to a purchase, a bid or a shipment.