Import guide · Senegal
Type approval for radio and telecoms equipment in Senegal: the role of ARTP
In Senegal, importing radio equipment requires prior approval from the Telecommunications and Posts Regulatory Authority (ARTP). The principle is laid down in Article 70 of Law No. 2018-28 of 12 December 2018 enacting the Electronic Communications Code. Terminal equipment, by contrast, can be supplied freely.
For a television, radio, site network or emergency communications project, the distinction between those two categories decides whether an approval file is needed before shipping. Enforcement has tightened since 2025, which makes planning ahead all the more worthwhile.
Updated on 20 October 2026
Radio equipment or terminal equipment: where the line falls
Article 70 prohibits manufacturing for the domestic market, importing, holding for sale, distributing, connecting to a public network or advertising radio equipment or installations that have not been approved in advance by the regulator. Radio installations always need approval, except those of licence or authorisation holders.
The same article states that terminal equipment is supplied freely, without prior approval. A broadcast transmitter, a microwave link, a Wi-Fi access point or a handheld radio falls under the first regime; how a multi-function device is classified should be confirmed with ARTP.
Procedure and approval timescale
Article 72 makes ARTP responsible for setting approval conditions for equipment, installations and installers, with regard to user safety, network protection, equipment compatibility and efficient use of spectrum. Approval must be notified within 2 months of receipt of a complete application, and any refusal must be reasoned. Article 73 makes approval subject to a filing fee set by ARTP.
Under the previous regime, the detailed conditions were set by Decision No. 2004-002 of 28 April 2004. They may have been revised since the 2018 code, so the current version should be obtained from ARTP.
Installers and ongoing compliance
Approval does not end at import. Under Article 71, installers of radio equipment must themselves be approved by ARTP, and Article 70 requires equipment to remain in line with the approved model at all times. A hardware or software change that alters radio characteristics may therefore call the approval into question.
For a television studio or radio network, the purchase plan should state who will install the equipment on site and confirm that this firm holds installer approval.
Stricter enforcement since 2025
Article 183 of the code sets a fine of FCFA 6 to 12 million for importing, holding for sale or selling non-approved radio equipment, and for advertising it. On 10 April 2025, ARTP set up a committee to tackle such equipment, bringing together customs, the national police, the industrial property agency ASPIT and the Senegalese Standards Association.
From Belgium, Sobetracom asks manufacturers for radio, electromagnetic compatibility and safety test reports covering the exact model, and passes them to the importer who files the approval application.
Frequently asked questions
- Does a batch of smartphones or mobile routers need approval?
- The code separates terminal equipment, supplied freely, from radio equipment, which needs approval. A device transmitting on radio frequencies may fall into both categories, so have ARTP confirm its classification before shipping.
- How long should we allow for approval?
- Article 72 requires notification within 2 months of a complete application. The clock only starts once the file is complete, so gather test reports and technical documentation before filing.
- What is the risk with non-approved equipment?
- A fine of FCFA 6 to 12 million under Article 183, and closer market checks since the enforcement committee was set up in 2025. Implementing rules change, so check the current procedure with ARTP and the importer's licensed customs broker before shipping.
Sources
- Vie-publique.sn (République du Sénégal), Journal officiel n° 7150 (December 2018)
- Code des communications électroniques (loi n° 2018-28), édition ARTP publiée sur vie-publique.sn (December 2018)
- Le Soleil, « L'ARTP met en place un comité de lutte contre les équipements radioélectriques non homologués » (April 2025)
- OSIRIS, textes de l'ARTP (April 2004)
This page summarises public sources as of the date shown. It does not replace the official text: check it before committing to a purchase, a bid or a shipment.